Kavan Tejarat Kiasam

Share This Project
Project at a glance
Project Type
Modern and well-equipped industrial factory
Location
Parand Industrial Town
Land Area
1950 Square meter
Building Area
2653 Square meter
Number of floors
4 floors

Introduction

Kavān Tejarat Company has initiated the construction of a mixed-use development consisting of an industrial warehouse (silo) and administrative facilities in Parand Industrial Town, aimed at expanding its production infrastructure and operational capabilities. Covering a land area of approximately 2,653 square meters, the project has been engineered to allow for future expansion in both function and capacity.

What happened?

The steel framework has been fully erected, and the project has entered the structural works phase, including blockwork, partition walls, and preliminary MEP (Mechanical, Electrical, Plumbing) installations.

Project progress rate
Foundation
Progress rate 100%
Structural and Masonry Work
Progress rate 60%
Envelope and Roofing
Progress rate 75%
Mechanical and Electrical Installations
Progress rate 15%
Interior Works
Progress rate 5%
Landscaping
Progress rate 0%
Operation and Maintenance
Progress rate 40%

In Total

Has Been Completed
% 0

Unique Features of the Project

Optimized structural design
Optimized structural design tailored to accommodate both industrial loads and administrative functionality, providing balance between durability and usability
MEP-ready infrastructure
MEP-ready infrastructure integrated during the structural phase, enabling smooth transition to utility installation with minimal rework
Dedicated equipment access zones
Dedicated equipment access zones included in the layout for future installation of industrial machinery and operational systems
Clear separation of construction areas
with well-defined staging zones for material delivery, worker access, and temporary equipment setup
Flexible layout planning
Allowing for future interior adjustments or expansion without major structural modification
Feature one
Feature Two
Feature Three
Feature Four
Feature Five
Feature Six

Engineering Challenges and Innovative Solutions

Projects always come with challenges, from technical issues to time and budget constraints. But we, as engineers, use our knowledge and creativity to find innovative solutions and overcome any challenge.

– Dual Structural Integration

One of the key engineering challenges was integrating two structurally distinct elements: a wide-span industrial hall and a conventional administrative building. Detailed structural modeling and independent joint design were conducted to ensure seismic resilience and avoid interference between the systems.

– Thermal Control and Temporary Ventilation

Due to the warm local climate and the need to protect construction materials during execution, temporary ventilation systems were deployed in key zones such as the storage areas and technical rooms. This approach helped manage humidity, preserve materials, and enhance working conditions during peak summer months.

– Scalable Infrastructure Design

The technical infrastructure has been designed for scalability, enabling future upgrades in electrical power, HVAC systems, and industrial automation without requiring major structural modifications.

Why Is This Project Unique?

As structural works near completion, the project will soon enter the architectural finishing and MEP implementation phase. The interior spaces are designed for productivity, flexibility, and integration with smart control systems. The landscaping strategy includes low-maintenance greenery and sustainable construction materials, aligning with the company’s long-term operational and environmental goals.